August 2003 Blackout

North American Electric Reliability Corporation

Where this source supports the record

Each entry separates the article’s editorial relevance note from its exact, section-level claims. A bibliography link without a direct claim is labeled plainly.

  1. Engineering failures · 14–16 August 2003

    The Northeast Blackout of 2003

    FirstEnergy control area and interconnected blackout region · United States

    Open article references →
    Why editors use it here

    Reliability record of cascade, plant trips, operators, system restoration, and lessons.

    1. Quick read

      On 14 August 2003, overloaded transmission lines sagged into trees in Ohio after software alarms failed at FirstEnergy's control room.

      Reviewed 26 July 2026
    2. Trigger and conditions

      A generating unit trip and high demand increased stress.

      Reviewed 26 July 2026
    3. Uncertainty

      The outage affected about fifty million people and 61,800 megawatts; numbers vary slightly by whether neighboring partial outages are included.

      Reviewed 26 July 2026
    4. Why it matters

      The blackout began with ordinary faults that should have been manageable.

      Reviewed 26 July 2026